This Project was located in Santa Rosa CA Courtyard Marriott Hotel existing asphalt was severely damaged by the unavoidable deterioration of a unit resulting from normal use. We demoed out the existing asphalt and replaced it with 3 1/2 inches of new asphalt.
- Approximately 50,000 SQFT
- Ranging from $190,0000 To $210,000